2nd Shift Operator

Open 19d
  • Responsibilities include ensuring production or manufacturing goals are met by tending machine, including but not limited to, opening
    gate and removal of parts, trimming parts and review for quality requirements before packing.
  • Able to perform in process inspection of all parts in accordance with the MCP, perform secondary process and rework as necessary
  • Operate machines as assigned and assist at other workstations as needed
  • Responsible for production reporting to include number of good parts, bad parts, down time with goal of exceeding standards.
  • Package products as directed in MCP
  • Read and follow operating manuals: work instructions, master samples, process alerts and procedures
  • Responsible for maintaining a clean and orderly work areas at each press including safety and 5S housekeeping


*** 2nd Shift Schedule: Monday - Friday 3:00 pm to 11:30 pm