freehire launches on Product Hunt on 26 August.

Follow →

AGM Planning

Open 47d

Role Purpose

Lead end-to-end planning across demand, supply, materials, and execution to ensure projects are delivered on time, within budget, and with optimal inventory and resource utilization.



Key Responsibilities

  1. Integrated Planning

o Drive S&OP / S&OE cadence aligning Procurement, Warehouse, and Installation.

o Convert forecasts, DPR/BOM, and project schedules into executable material and capacity plans.

o Freeze weekly/monthly dispatch and installation plans.

  1. Material & Inventory Planning

o Plan procurement and replenishment based on BOM, lead times, and safety stock.

o Eliminate SKU duplication and ensure BOM–SKU alignment in FEP.

o Control slow/non-moving and excess inventory.

  1. Production / Fabrication Planning (Structures/BOS)

o Plan fabrication schedules with vendors considering HDG timelines and capacity.

o Track customized vs. standard structure readiness against project need dates.

  1. Dispatch & Logistics Planning

o Create warehouse-wise dispatch plans to meet installation targets.

o Optimize vehicle loads, routes, and TAT for inter-state movements.

o Monitor dispatch accuracy as per DPR/BOM.

  1. Cross-Functional Coordination

o Work closely with Design for timely DPR/BOM release and revisions.

o Coordinate with Procurement for material availability and vendor schedules.

o Align with Warehouse for packing, QC, and dispatch readiness.

o Interface with Installation for site readiness and shortage prevention.

  1. System & Process Governance

o Ensure WMS reflects real-time project stage (Procurement → Dispatch).

o Standardize SKU descriptions and eliminate ambiguity (“OR” specs).

o Implement planning dashboards and MIS for visibility.

  1. Performance Monitoring

o Track KPIs: TAT, Fill Rate, Inventory Turns, Dispatch Accuracy, Project Cycle Time.

o Identify bottlenecks and implement corrective actions.

  1. Risk Management

o Anticipate material shortages, vendor delays, and design changes.

o Prepare contingency plans and alternate sourcing.

  1. Team Leadership

o Lead planning team across locations.

o Train teams on BOM discipline, system usage, and planning hygiene.



Key KPIs

· On-Time Project Dispatch (%)

· Installation readiness vs. plan

· Inventory accuracy and turns

· Reduction in SKU mismatches

· Vendor adherence to fabrication timelines

· Dispatch TAT improvement

· Zero dispatch deviation from BOM/DPR



Qualifications

· Bachelor’s in Engineering / Supply Chain / Operations or Graduation

· 7 years in Planning, SCM, or Operations .



Skills Required

· Strong S&OP and material planning expertise

· WMS proficiency

· Data analysis and MIS reporting

· Vendor and cross-functional coordination

· Problem solving and process orientation

· Leadership and stakeholder management




See also

Tailor your CV for this role?

We couldn't check your fit for this role — add a CV to your profile to see it next time.

A new version of freehire is available