Air Quality Permitting & Compliance Manager
Who recruits here Pro
Up to three recruiters at Fermi America with their work email, so you can write to a person.
Part of Pro. How it works
Description
Company Summary:
Fermi America is pioneering the development of next-generation energy infrastructure to power the future of artificial intelligence. By delivering highly reliable, gigawatt-scale power solutions, we are helping meet the rapidly growing energy demands of advanced AI technologies. Our flagship HyperGrid™ campus in Amarillo, Texas, is designed to become one of the world's largest energy-driven AI complexes, integrating nuclear, natural gas, utility, solar, and battery power. With a planned 17 gigawatts of power capacity and 18 million square feet of AI infrastructure, Fermi America is positioned to play a leading role in the future of energy and artificial intelligence. At Fermi America, we are building more than infrastructure. We are creating opportunities for talented professionals to help shape the next generation of energy and AI innovation.
Job Summary:
Fermi America is seeking an experienced and technically strong Air Quality Permitting & Compliance Manager to own every air authorization and air compliance obligation for Project Matador, from construction through commissioning and into operations. Reporting to the Environmental Manager, this role will maintain and amend the project's NSR/PSD/GHG PSD air permit, support the pending second air permit application, prepare the Title V and Acid Rain permit applications, and lead the continuous emissions monitoring program. The Air Quality Permitting & Compliance Manager will serve as Fermi America's primary point of contact with the Texas Commission on Environmental Quality (TCEQ) on air matters. The ideal candidate brings deep TCEQ permitting experience on turbines or engines, hands-on CEMS and 40 CFR 75 experience, and the ability to build an air compliance program on a fast-moving greenfield project.
Responsibilities:
- Permits: Maintain and amend NSR/PSD/GHG PSD Permit 181009, support pending Application 183462, and protect the 18-month construction-start deadline (30 TAC 116.120). Manage standard permits and Permits by Rule (30 TAC 106), and verify contractor concrete batch plant registrations.
- Federal programs: Prepare the Title V application (30 TAC 122; 40 CFR 70) and the Acid Rain permit application (40 CFR 72), which has a long lead time before first fire. Ensure compliance with NSPS (40 CFR 60, Subparts KKKa, IIII, JJJJ) and NESHAP standards (40 CFR 63, Subparts YYYY, ZZZZ), including 40 CFR 60.7 construction and startup notifications.
- Continuous monitoring: Lead CEMS design review, certification, monitoring plans, RATAs, and QA/QC under 40 CFR 75 and 40 CFR 60 Appendices B and F; oversee stack testing and data acquisition and handling system reporting.
- Technical analysis: Perform emissions calculations, BACT analyses, AERMOD ambient air modeling, and applicability determinations, including source aggregation of tenant backup generators.
- Reporting: Prepare the Annual Emissions Inventory (30 TAC 101.10), deviation reports, Title V compliance certifications, and emissions event and maintenance reporting (30 TAC 101.201 and 101.211).
- Construction air quality: Manage fugitive dust and opacity control, wind-speed stop-work triggers, and open-burning prohibitions (30 TAC 111); coordinate asbestos NESHAP notifications (40 CFR 61, Subpart M) with the Waste, Hazardous Materials & Remediation Coordinator.
- Refrigerants: Manage refrigerant compliance for data center cooling systems (40 CFR 82, Subpart F), as applicable.
- Program management: Lead air pollution prevention, design-change review, air consultant management, and TCEQ inspections.
- Contractor compliance: Enforce the Contractor Environmental Compliance Manual (ENV-STD-001) and the pre-mobilization gate, with stop-work authority for environmental noncompliance.
- On-call: Participate in a 24-hour on-call rotation for releases, emissions events, and storm events, including notifications required within 24 hours.
- Audits: Conduct media-specific audits of the role's own program and support the site's multimedia audit program.
- Training: Develop and deliver program-specific environmental training for employees and contractors.
- Records: Keep all program records producible to an agency inspector within 24 hours.
Skills
Sign in to read and join the discussion.