CDL Fuel Truck Driver - Data Center Construction Projec ()
Posted 51
views
Who recruits here Pro
Up to three recruiters at Delta Fuel Company, LLC with their work email, so you can write to a person.
Part of Pro. How it works
Summary
Operate a bobtail fuel truck to keep construction equipment fueled at a data center construction site in Texas, tracking daily fuel inventory and following DOT, HazMat, and site safety procedures. Requires a Class A or B CDL with HazMat and Tanker endorsements; housing, per diem, and overtime offered.
- Operate bobtail fuel trucks to fuel construction equipment across the jobsite
- Fuel equipment at stationary fueling stations as needed
- Follow all DOT, HazMat, and site safety procedures, including spill prevention and PPE use
- Track and report fuel inventory daily with accurate records
- Communicate clearly and professionally with customers and site personnel to keep equipment fueled and on schedule
- Perform and document pre- and post-trip inspections
- Report any equipment issues, safety concerns, or discrepancies right away
What We Offer
- Housing provided
- Per diem
- Overtime pay
- Medical, dental, and vision insurance
- 401(k)
- Long-term, steady work
Requirements
- Valid Class A or Class B CDL with HazMat and Tanker endorsements (required)
- Current DOT medical card
- Clean driving record
- Safety-minded, with a strong commitment to following procedures
- Ability to work 12-hour shifts, 6 and sometimes 7 days per week
- Strong attention to detail, especially with inventory and record-keeping
- Excellent communication and customer service skills
- Reliable, self-motivated, and able to work independently or as part of a team
- Ability to pass a background check and DOT drug screen
- Fuel delivery or construction site experience preferred
Sign in to read and join the discussion.