Pipeline Pre-Comm Foreman / offshore / 16.11.26
Posted Updated 4
views
Description
Comm. & Maint. Instr. and Control Foreman
is responsible for overseeing and coordinating the safe and efficient execution of pipeline pre-commissioning activities, including cleaning, gauging, hydrotesting, dewatering, drying, and inerting. This role ensures compliance with project procedures and reports to the Pre-Commissioning Supervisor and Engineer.
Key Responsibilities
- Operational Oversight: Coordinate all pre-commissioning operations, including pipeline cleaning, gauging, flooding, hydrotesting, dewatering, drying, and nitrogen purging, ensuring adherence to project approved procedures.
- Team Leadership: Manage and direct a team of technicians, operators and helpers, assigning tasks, monitoring performance, and ensuring safe work practices are followed.
- Compliance: Ensure all activities comply with company specifications (e.g., AGES-SP-10-014), industry standards (e.g., DNVGL-ST-F101), and health, safety, and environmental (HSE) regulations.
- Equipment Management: Oversee the selection, inspection, and operation of pre-commissioning equipment, including PIGs, pumps, compressors, and testing instruments, ensuring proper maintenance and functionality.
- Coordination: Collaborate with project engineers, and third-party contractors to align on project objectives and technical requirements.
- Documentation: Maintain accurate records of all pre-commissioning activities, including test results, equipment logs, and ensuring traceability and adherence to operational procedures.
- Risk Management: Identify potential risks during pre-commissioning operations and implement mitigation measures to ensure safety and project success.
- Reporting: Provide regular updates to the Pre-Commissioning Supervisor/Engineer on progress, challenges, and resource requirements, escalating issues as needed.
Qualifications and Experience
- Education: High school diploma or equivalent; technical certification or diploma in mechanical engineering, pipeline operations, or a related field is preferred.
- Experience: Minimum of 5 years of experience in pipeline pre-commissioning, with at least 2 years in a foreman role.
- Technical Knowledge: Familiarity with pipeline pre-commissioning processes, including cleaning, gauging, hydrotesting, and drying.
- Skills:
- Excellent understanding of pipeline systems and pre-commissioning equipment.
- Proficient in interpreting technical specifications and engineering drawings.
- Effective communication and interpersonal skills for coordinating with diverse parties.
- Problem-solving skills to address operational and technical challenges.
- Physical Requirements: Ability to work in various environmental conditions, including offshore and remote locations, and perform physically demanding tasks as needed.
Working Conditions
- Environment: Field-based role, primarily at pipeline construction and pre-commissioning sites, including offshore or remote locations.
- Schedule: Rotational or project-based schedule, which may include extended hours, weekends, or on-call duties.
Languages: English Language skills required
Sign in to read and join the discussion.