Construction Scheduler
Description
Construction Scheduler | Life Sciences and Advanced Manufacturing Construction | Greater Philadelphia (Hybrid)
Role Overview
Our client is a well-established specialist construction contractor delivering technically demanding projects for the life sciences and advanced manufacturing sectors. With a strong reputation in its niche and a steady pipeline of work across the US, the business is looking for an experienced Construction Scheduler to join its pre-construction team in the Greater Philadelphia area.
Why the Role Exists
The business is strengthening its scheduling capability as it plans for continued growth. The role sits at the front end of projects. You will develop schedules at proposal stage, refine them through design and pre-construction, and hand over a robust, buildable plan to the project managers who run delivery. It is a long-term hire into a business that values stability and continuity.
Key Responsibilities
- Build detailed, logic-driven schedules in Primavera P6 and Microsoft Project from drawings, estimate data and team input.
- Develop conceptual and detailed schedules to support bids and proposals, often to tight deadlines.
- Establish and maintain baselines that reflect realistic durations, trade sequencing and controlled-environment requirements.
- Lead and support pull planning sessions with clients, subcontractors and project teams.
- Produce critical path, float and variance analysis, and lead recovery planning when projects fall behind.
- Align schedules with cost codes, and work with estimating on productivity data and crew sizing.
- Help build scheduling discipline and standard practice as the project controls function develops.
Candidate Profile
- 4+ years of construction scheduling experience, with strong Primavera P6 proficiency and working knowledge of Microsoft Project.
- A genuine understanding of building construction and sequencing, with the ability to read drawings and build schedule logic independently.
- Experience in pharmaceutical, semiconductor, healthcare, controlled-environment or general building construction projects.
- Familiarity with pull planning, resource-loaded schedules and critical path method.
- Clear communicator, comfortable working with estimators, project managers and senior leadership.
- A degree in Construction Management, Engineering or a related field is preferred. Equivalent experience will be considered. PMP or PSP is a plus.
What the Company Offers
- Base salary plus a share in company profits.
- Hybrid working, with four days in the office and one day remote.
- A long-term role in a specialist business, working on technically interesting projects.
- Clear scope to progress into pre-construction or project management roles.
- Limited travel, typically no more than around 10%.
Skills
Sign in to read and join the discussion.