DUQ0006
Description
About us
Worley is a global company of energy, chemicals and resources experts headquartered in Australia. We partner with our customers to deliver projects and create value across the life of their assets. We specialize in consulting, engineering, procurement and construction across the project lifecycle, with services extending through to operations and decommissioning. Leveraging extensive experience and AI-enabled delivery, we support customers in navigating complexity as they meet today's needs and transition to more sustainable solutions.
Core Responsibilities\:
• Supervision of BESS installation, integration and commissioning, including battery
management system (BMS) and fire/thermal safety systems verification;
• Witness BESS Performance Test (Power Rating, Energy Capacity, Round-Trip Efficiency) and
support Plant Reliability Run verification.
Other requirements
• Owner’s Engineer or equivalent Lender’s Technical Adviser experience on at least three (3)
utility-scale renewable energy projects (Wind and/or Solar PV, each of at least 100 MW
capacity) that have reached Commercial Operation Date within the last ten (10) years;
· Owner’s Engineer experience on at least one (1) Battery Energy Storage System (BESS)
project of at least 100 MWh capacity, including commissioning and performance testing
oversight;
• Experience working on Independent Power Projects (IPPs) structured under a Power Purchase
Agreement (PPA) with a national or regional Off-taker, including familiarity with PPA testing,
commissioning and performance guarantee regimes;
• Design review or construction supervision experience on grid substation and transmission
interconnection works (132 kV or above), including interfacing with a national/regional
transmission system operator .
• Demonstrated regional experience in the Sultanate of Oman and/or the wider GCC is preferred,
including familiarity with the Oman Local regulation and Grid Code requirements
Sign in to read and join the discussion.