Energy Marshal - Data Center Construction in Atlanta
Description
Job DescriptionJob Description
Job Overview
We are seeking experienced Energy Marshals for potential large-scale data center construction opportunities in the Atlanta, Georgia area.
This position is ideal for an electrical safety professional with extensive experience managing hazardous energy control, Lockout/Tagout (LOTO) procedures, electrical isolation, and controlled energization activities on complex mission-critical construction projects.
The ideal candidate has previous experience serving as a designated Energy Marshal or in a comparable position with direct responsibility for electrical isolation and energization safety.
Key Responsibilities
- Oversee hazardous energy control and electrical isolation procedures.
- Coordinate and verify Lockout/Tagout (LOTO) requirements during construction, testing, and commissioning.
- Review energy isolation plans, switching procedures, and applicable energization permits.
- Coordinate controlled energization activities with authorized personnel, electrical contractors, equipment manufacturers, and commissioning teams.
- Verify appropriate electrical safety boundaries, isolation points, and documentation.
- Ensure compliance with OSHA regulations, NFPA 70E, and project-specific electrical safety requirements.
- Participate in pre-energization meetings, safety reviews, and readiness assessments.
- Identify hazardous energy risks and address unsafe conditions.
- Maintain detailed records of electrical isolation, testing, approvals, and release procedures.
- Support safe transitions from construction through equipment testing, commissioning, and system turnover.
Required Qualifications
- 5+ years of electrical construction, electrical safety, commissioning, or critical power systems experience .
- Demonstrated responsibility for hazardous energy control and electrical isolation programs.
- Strong understanding of NFPA 70E and OSHA electrical safety requirements.
- Experience with medium-voltage distribution equipment, switchgear, transformers, and electrical power systems.
- Familiarity with switching procedures, electrical isolation, and energization protocols.
- Ability to interpret electrical one-line diagrams and identify isolation points.
- Experience coordinating electrical safety activities across multiple contractors.
- Strong communication, documentation, and risk-management skills.
Qualifications
- Previous formal appointment as an Energy Marshal or Authorizing Energy Marshal.
- Hyperscale data center construction or commissioning experience.
- Experience managing electrical isolation boundaries and energization procedures.
- Familiarity with UPS systems, generators, switchgear, and critical power distribution.
- OSHA 30 certification and relevant electrical safety training.
What This Opportunity Offers
- Highly competitive compensation based on qualifications.
- Opportunities to work on major mission-critical construction projects.
- High-responsibility electrical safety leadership role.
- Exposure to sophisticated electrical infrastructure and commissioning operations.
- Potential for long-term opportunities within the data center construction industry.
Company Description
Representing a Confidential Company
Company DescriptionRepresenting a Confidential Company
Skills
Sign in to read and join the discussion.