Skip to content
Search jobs inside your AI agent. Claude, ChatGPT, Claude Code, Codex, Gemini, Cursor and Grok
Connect

BOLD Business

Fiber Construction Manager, Data Center (OSP and ISP)

Posted Updated 31 views

Who recruits here Pro

Up to three recruiters at BOLD Business with their work email, so you can write to a person.

View plans

Part of Pro. How it works

Description

Role Summary

We are looking for a Fiber Construction Manager to join our team who can lead fiber placement and inside plant installation on data center campus projects. The work covers high-count fiber (3,456-count and up, including pre-terminated cable) placed through underground duct and manhole systems between buildings, then spliced, tested and connected inside the data center. Major materials are typically furnished by the owner; the contractor provides labor, tools, equipment and minor consumables.

The ideal candidate will be a hands-on leader with data center or hyperscale experience who can run crews, protect pre-terminated cable, and deliver clean test and closeout documentation. This role requires national travel, with an initial deployment in North Carolina; per diem and travel logistics are provided.

Responsibilities

  • Run each project from mobilization to closeout: cable placement, splicing, testing and inside plant work.
  • Lead and schedule several crews, including pulling crews, ribbon splicers, testers and rack-and-stack techs, plus subcontractors.
  • Oversee heavy cable placement through ducts and manholes, including duct proofing, clearing obstructions, dewatering and tension recording on every pull.
  • Protect pre-terminated cable, which can't be cut, by managing slack storage, reel handling and labeling.
  • Oversee mass ribbon fusion splicing, cable end prep, bidirectional OTDR testing, and MPO/MMC loss and polarity testing.
  • Manage inside plant installation: racks, vertical cable managers, fiber shelves and panels, and firestop.
  • Own the daily progress reports, unit-production tracking, test documentation, as-builts and closeout package.
  • Enforce site safety, including confined-space entry, fall protection, badging and data center security rules.
  • Be the day-to-day contact for the client's project manager and inspectors.

Requirements

  • 7 or more years in fiber construction, with at least 3 years leading crews as a foreman, field supervisor or project lead.
  • Hands-on experience with high-count cable (864 to 3,456-count or more) and mass ribbon splicing.
  • Data center or hyperscale campus experience, plus outside plant underground work.
  • References for placing pre-terminated, high-count cable on data center campuses.
  • Strong grasp of OTDR and loss testing, reading test reports, and acceptance criteria.
  • Experience tracking unit-priced or production work.
  • OSHA 30, plus confined-space and fall-protection training. First Aid certification required; CPR preferred.
  • Comfort with splice diagrams, route prints and as-built documentation.
  • Valid driver's license, able to pass a background check and drug screen, and willing to travel and stay on site.

Nice to Have

  • FOA CFOT or CFOS, or BICSI.
  • Experience working with EXFO or VIAVI test gear and Fujikura ribbon splicers.
  • Your own crew or a network of splicers you can bring.

Skills

Apply

See also

Skilled Trades jobs by country — openings, pay and top skills →