Skip to content

Search jobs inside your AI agent. ClaudeChatGPTCursorGrok Bot

Connect

Taggd

General Manager - Project Management - Air/Water & Gas Infrastructure

Posted Updated
Discussion

Description

Purpose - Why does this role exist?:

The Project Manager Air, Water (Raw, Process, Potable and Fire) & Gas - Infra and Logistic Internal is a senior leadership role responsible for orchestrating the erection, Commissioning, handover of Air, Water & Gas related to Balance Of Plant within the Integrated Steel Plant.

The role ensures that all Air, Water (Process, Potable and Fire) & Gas - Infra (Compressed Air, Oxygen, Nitrogen, Argon, Natural Gas, By product Gases, Water (Raw, Process, Potable & Fire), etc) are constructed, commissioned within stipulated time & Budgeted cost such that the facilities deliver world-class performance from Day-1 of plant startup.

This position plays a pivotal role in ensuring the Air, Water (Raw, Process, Potable and Fire) & Gas - Infra internal facilities are constructed to meet the requirements of the Integrated Steel Plant ensuring global construction productivity, safety, Quality, digitalization, and sustainability benchmarks.

One Safety Culture:

At AMNS India Private Ltd, safety is the cornerstone of our operations, projects, and other activities.

We believe in an 'interdependently safe culture' with a greater sense of accountability within our workforce.

We chose a zero-tolerance policy for unsafe work behaviours/practices, ensuring that everyone adheres to rigorous safety standards to protect themselves, their colleagues, and our workplace.

All are expected to demonstrate a proactive commitment to safety, including identifying hazards and implementing adequate controls.

Join us in fostering a culture where safety is non-negotiable, and every action contributes to our goal of a zero-incident workplace.

Key Result Areas (Key Performance Indicators):

- 1. Architect the end-to-end Construction, commissioning of Air, Water (Raw, Process, Potable and Fire) & Gas - Infra and Logistic Internal facilities as per Construction Master Plan (CMP) for the greenfield ISP.

- 2. Drive construction, commissioning of Utilities integration of process flows, interdependencies, and operating philosophies across Air, Water (Raw, Process, Potable and Fire) & Gas - Infra and Logistic Internal.

- 3. Ensure readiness of Air, Water (Raw, Process, Potable and Fire) & Gas - Infra and Logistic Internal to meet the construction timelines of the Integrated Steel Plant.

- 4. Provide strategic leadership for construction & serve as link between Engineering, Operations, and other enabling functions.

- 5. Champion a "One-Plant One-Team" approach ensuring cohesive execution across diverse stakeholders.

- 6. Facilitate structured governance mechanisms, steering committees, and integration reviews with senior management by providing necessary construction related inputs.

- 7. Lead development of construction & commissioning strategies, construction checklists, and construction performance validation protocols for Air, Water (Raw, Process, Potable and Fire) & Gas - Infra and Logistic Internal.

- 8. Plan & execute post construction cold/hot commissioning, process stabilization, and PG test execution & hand over to Operations team.

- 9. Drive resolution of early construction bottlenecks through cross-disciplinary interventions.

- 10. Ensure alignment of Construction quality and safety management systems with global best practices.

- 11. Promote construction excellence and continuous improvement culture within team.

- 12. Lead manpower planning, competency mapping, and readiness training programs for Air, Water (Raw, Process, Potable and Fire) & Gas - Infra and Logistic Internal construction team.

- 13. Coordinate with OEMs, technology partners for progress updates, inputs required for Air, Water (Raw, Process, Potable and Fire) & Gas - Infra and Logistic Internal Engineering, construction and commissioning.

- 14. Ensure that the workforce, systems, and processes are followed during construction & commissioning.

- 15. Identify and mitigate construction related-related risks.

- 16. Build construction progress dashboards and monitor overall progress.

- 17. Provide structured reports to Chief Projects - East regarding construction progress, resource planning, delay analysis, catch up plans.

- 18. Establish documentation governance for construction readiness and commissioning activities.

Critical Tasks (Key Activities):

- 1. Architect the end-to-end Construction, commissioning of Air, Water (Raw, Process, Potable and Fire) & Gas - Infra and Logistic Internal facilities as per Construction Master Plan (CMP) for the greenfield ISP ensuring Quality, Safety & timelines.

- 2. Build construction progress dashboards and monitor overall progress.

- 3. Provide structured reports to Chief Projects - East regarding construction progress, resource planning, delay analysis, catch up plans.

- 4. Ensure all Construction documentation for Air, Water (Raw, Process, Potable and Fire) & Gas - Infra and Logistic Internal construction & commissioning are maintained.

Education Qualification & Certifications:

B.Tech/B.E. in Mechanical/Chemical; Postgraduate qualifications preferred.

Relevant Experience: 20 - 25 years of experience in large Integrated Steel Plants with substantial exposure to greenfield/brownfield Balance Of Plant Utilities & Water systems erection & commissioning.

Skills & Competencies:

- 1. Strong expertise in Construction & commissioning of Utilities & Water internal infra.

- 2. Proven capability in leading multi-disciplinary technical teams in complex, large-scale industrial projects.

- 3. Strategic thinking with systems orientation.

- 4. Executive-level decision making and problem-solving.

- 5. Strong communication and stakeholder management capability.

- 6. High influencing and collaboration skills across organizational layers.

- 7. Catalyst for change, innovation, and digital strategy.

- 8. High integrity, governance, and safety mindset.

- 9. Excellency and mastery of Utilities & Water internal infra-Construction & commissioning.

- 10. Experience in design preferable and close co-ordination with D&E teams.

- 11. Working relationships with External stakeholders, Equipment suppliers, technology partners.

Skills

Apply

See also