HVAC Site Engineer (Data Center Construction)
Branch of Sterling and Wilson Data Center Private HVAC Site Engineer (Data Center Construction)
Description
Supervise and execute HVAC works as per approved drawings specifications method statements and project schedule Manage installation of AHUs FCUs CRAC CRAH units chillers pumps cooling towers ducting piping valves and associated equipment Review IFC shop drawings and coordinate with Civil Electrical Plumbing Firefighting ELV and BIM teams to resolve clashes and interfaces Monitor HVAC subcontractors manpower materials productivity and daily progress Ensure proper installation of ducting chilled-water piping insulation supports equipment and associated services Coordinate pressure testing flushing duct leakage testing TAB and testing commissioning activities Ensure compliance with approved method statements ITPs QA QC and HSE requirements Raise close WIR IR NCRs punch points and inspection observations Support HVAC pre-commissioning commissioning and integrated testing particularly for critical Data Center systems Maintain progress reports testing records as-built drawings and handover documentation.
Diploma/B.E./B. Tech in Mechanical Engineering / HVAC / relevant discipline. 6-10 years of relevant HVAC site execution experience Data Center / Mission Critical / Large EPC project experience preferred Strong knowledge of HVAC installation, chilled-water systems, ventilation and critical cooling systems Experience with CRAH/CRAC units, chillers, cooling towers, pumps and associated controls preferred Good understanding of ASHRAE standards, project specifications and applicable codes Ability to read IFC, shop and MEP coordination drawings Experience in subcontractor and site execution management Proficiency in AutoCAD; BIM/Navisworks/Revit knowledge is an advantage Strong coordination, problem-solving and site management skills.
Skills
Sign in to read and join the discussion.