Skip to content
Search jobs inside your AI agent. Claude, ChatGPT, Claude Code, Codex, Gemini, Cursor and Grok
Connect

SNME Anipsotiki

NewBe an early applicant

Lifting Engineer

Posted Updated

Description

1. POSITION SUMMARY

Position Title: Lifting Engineer

Company: SNME Anipsotiki Company (SNA) - Joint Venture of Sarens, NASS Group and Anipsotiki

Project: 1 GW Shaqra Onshore Wind Project, Kingdom of Saudi Arabia

Contractor Scope: Heavy crane and lifting operations; WTG installation (103 WTGs)

Reports To: Site Manager (line); Project Manager (functional)

Key Interfaces: Client installation and site management, Owner engineering team, HSSE Manager, crane suppliers and third-party inspection bodies

Supervises: Lifting Supervisors, Riggers, Signalmen / Banksmen and Crane Operators (technical direction)

Work Location:

Work Location: Shaqra project site, KSA (site-based)

Procedural Role: Technical Authority (TA) / Appointed Person for Lifting Operations (APLO) under Lifting Operations Safety Procedure AP-C-HSSE-SP-005


2. PURPOSE OF THE ROLE

The Lifting Engineer acts as the Technical Authority and Appointed Person for Lifting Operations for SNA's scope on the project, as defined in the Owner's Lifting Operations Safety Procedure AP-C-HSSE-SP-005. The role ensures that every tower, nacelle, hub and blade lift is engineered, approved and carried out within crane capacity, ground-bearing limits and wind-speed limits, with zero lifting incidents and minimum crane downtime.


3. KEY DUTIES AND RESPONSIBILITIES

3.1 Lift Categorisation and Lift Plan Approval

• Ensure every lifting operation is categorised (Category 1, 2 or 3) using the AP-C-HSSE-SP-005 questionnaire before planning starts.

• Treat WTG main component lifts (loads of 25 t and above, tandem and tailing lifts, upending of tower sections and blades) as Category 3 lifts.

• Review and approve lift plans for Category 1, 2 and 3 operations developed by the Lifting Supervisors (Competent Persons) on the FM-001 Lifting Plan template.

• Provide technical input and calculations for Category 3 lift plans: load distribution in rigging, crane utilisation, ground bearing, and wind speed and direction including sail effect and drag coefficient.

• Submit Lift Plans and Risk Assessments for Owner approval before any work starts.


3.2 Crane and Lifting Equipment Selection

• Assist in selecting cranes, configuration (boom / jib length, counterweight, radius) and rigging from OEM load charts.

• Specify lifting accessories (slings, shackles, spreader beams, blade yokes, lifting tools) and verify their working load limits.


3.3 Ground Conditions, Crane Assembly and Relocation

• Calculate crane ground-bearing pressures and verify them against crane pad, hardstand and access-road design capacity.

• Coordinate with the client on crane pad levels, compaction results and slope tolerances before crane set-up.

• Review crane assembly / disassembly plans and plans for crane moves between WTG positions, including assist-crane lifts.


3.4 Supervision of Special Lifts when Required

• Supervise Category 3 lifting operations and attend pre-lift meetings for critical WTG lifts.

• Enforce wind limits: the OEM maximum operating wind speed is never exceeded; where the OEM gives no limit, 10 m/s applies, and any work above 10 m/s needs a detailed risk assessment.

• Ensure wind speed is monitored continuously and the lift is stopped immediately if any limit is exceeded.

• Determine Management of Change requirements: any change to an approved Lift Plan or RA means stop work until a Competent Person confirms it is safe.


3.6 Competence, Contractors and Training

• Assess the capability of crane and lifting subcontractors before mobilisation and during the works.

• Verify lifting personnel hold the competence set in the procedure’s Role and Competency Matrix (Lifting Supervisor / Rigger Level 2, third-party certified operators and riggers).

• Provide training and technical briefings to lifting personnel where required.


3.7 Incident Investigation and Continuous Improvement

• Investigate HSSE events related to lifting with the HSSE Manager and share lessons learned.

• Review lifting processes and procedures for improvement.

• Maintain the lift register, approved lift plans, inspection and examination records for the retention periods required.


3.8 Planning and Productivity

• Align the lifting schedule with the WTG installation programme and component delivery plan.

• Report weekly lifting progress and look-ahead to the Site Manager and Project Manager.



Skills

Education: Bachelor's degree in Mechanical Engineering (or similar professional qualification) with specific knowledge of crane and lifting operations

Lifting Competency: Appointed Person for Lifting Operations (APLO), ECITB Advanced or LEEA, qualified for the class of equipment (AP-C-HSSE-SP-005, Section 6.5)

Standards Knowledge: BS 7121, LOLER 1998, LEEA, EIAC, GAC, SASO or equivalent

Experience: Minimum 8 years in heavy lifting and crane operations, including at least 3 years on onshore wind turbine installation

Crane Experience: Lift planning for large crawler and mobile cranes (500 t class and above), including tandem lifts

Lift Planning Software: Proficiency in lift planning tool (e.g. 3D Lift Plan, LICCON Job Planner, KranXpert) and AutoCAD

Professional Registration: Saudi Council of Engineers (SCE) accreditation, or eligibility to obtain it on joining

GWO Training: Valid GWO Basic Safety Training (required for WTG access)



5. PREFERRED QUALIFICATIONS

• LEEA lifting equipment examination / inspection qualification

• GWO Enhanced First Aid and GWO Control of Hazardous Energies

• NEBOSH International General Certificate or equivalent HSE qualification

• Experience with Goldwind or other major WTG OEM installation manuals and lifting tools

• Previous experience on wind projects in Saudi Arabia or the GCC


6. KEY SKILLS AND COMPETENCIES

• Strong command of crane load charts, rigging engineering and ground-bearing calculations

• Sound judgement on go / no-go decisions under changing weather conditions

• Ability to lead multi-national lifting crews and coordinate with client and OEM teams

• Clear technical writing for lift plans, method statements and reports

• Planning discipline: lifting sequence, crane moves and look-ahead scheduling

• Proficient in MS Office, AutoCAD and lift planning software


7. KEY PERFORMANCE INDICATORS

• Zero lifting incidents, dropped objects or crane overloads

• 100% of lifts categorized and executed under an approved lift plan

• 100% of Critical Lifts Supervision

• Crane relocation and assembly Planning

• Timely submission of lift plans, method statements and daily lifting reports


8. WORKING CONDITIONS

Site-based role at remote wind and power project locations in KSA.

Rotation and working hours as per company policy and project needs.

Skills

Apply

See also