Line Operator
Description
|
· Check components at start of shift (valves/cans)—verify Item code with Shop Packet · Every hour and at start of shift check the following: 1) weights of concentrate and propellant 2) pressure 3) vacuum 4) crimp depth & diameter, stem height 5) water bath temperature and water level 6) Test the checkweigher machine using an challenge can checkweigher machine using an challenge can · Make sure there is water in the water bath maintained at or above 130oF · Check for dents and dirt · When using Nitrogen, make sure it is going in the can · Check batch # with compounding to make sure you have right concentrate, also verify with green release sticker from the lab. · At the end of a run, do a good wash-up: 1) clean up filling heads, conveyors, hopper 2) gas room 3) Fill out Filling Room Cleaning Log · At the end of a run, remove all cans/valves from the last run · Fill out Line Set-up Form in the following areas: 1) Inspect Cans/Labels for damage 2) Check codes against batch sheet 3) Concentrate Release Number 4) Sanitation of Surge Tank and Filling Heads Completed 5) Scale Set-up (for tare weight) 6) Line Set-up Purge 7) Water temp between 55°C - 65°C(130°F-154°F). · No green stickers are to be left on pails. · Perform other duties as assigned. |
Sign in to read and join the discussion.