Skip to content
Search jobs inside your AI agent. Claude, ChatGPT, Claude Code, Codex, Gemini, Cursor and Grok
Connect

Nityo Infotech Indonesia

NewBe an early applicant

Mechanical Design Engineer (Data Center & Construction)

Posted

Description

Job Title: Mechanical Engineer ( Design and Construction )

Department : Data Center

Total years of experience : 7+ years


A. Qualifications and Experience

  1. Bachelor's Degree in Mechanical Engineering or a related Engineering discipline.
  2. Minimum 7 years of experience in mechanical engineering design, construction, or commissioning, preferably within data center and mission-critical facilities.
  3. Strong knowledge of mechanical systems for data centers, including HVAC, chilled water systems, direct expansion (DX) systems, ventilation, fire protection, plumbing, drainage, and water treatment systems.
  4. Experience supporting testing and commissioning activities, including Functional Performance Testing (FPT), Integrated System Testing (IST), and system handover.



B. Duties and Responsibilities:

  • Assist in the planning, design, and delivery of mechanical engineering systems for greenfield and brownfield data center projects, ensuring compliance with project requirements, industry standards, and operational performance objectives.
  • Coordinate and support the design, review, and implementation of mechanical systems, including HVAC, fire protection, plumbing, drainage, and other critical mechanical infrastructure for mission-critical facilities.
  • Act as the Mechanical Engineering Lead for assigned projects, coordinating multidisciplinary engineering activities to ensure project deliverables are completed within scope, budget, schedule, and quality requirements.
  • Prepare and review engineering calculations, design reports, technical specifications, drawings, and equipment schedules for mechanical systems.
  • Develop and review technical specifications for major mechanical equipment, including chillers, cooling towers, CRAH/CRAC units, air handling units (AHUs), pumps, heat exchangers, piping systems, and ventilation equipment.
  • Perform engineering analysis of mechanical system performance and recommend improvements to optimize energy efficiency, reliability, maintainability, and Power Usage Effectiveness (PUE).
  • Review engineering designs and technical submissions from consultants and contractors to ensure compliance with applicable codes, client requirements, and company engineering standards.
  • Support the development and continuous improvement of mechanical engineering standards, design guidelines, standard details, and technical specifications.
  • Provide technical support throughout construction, including reviewing Requests for Information (RFIs), shop drawings, material submittals, method statements, and resolving site-related engineering issues.
  • Participate in factory acceptance tests (FAT), site inspections, testing and commissioning (T&C), integrated system testing (IST), and project handover activities as required.
  • Coordinate closely with electrical, civil, structural, architectural, commissioning, operations, and project management teams to ensure successful project execution.
  • Support cost estimation, value engineering, and constructability reviews to achieve the optimum balance between cost, quality, maintainability, and operational reliability.
  • Monitor assigned engineering activities to ensure deliverables are completed in accordance with approved project schedules, budgets, and quality objectives.
  • Liaise with consultants, contractors, clients, utility providers, and relevant government authorities to facilitate technical reviews, statutory approvals, and project implementation.
  • Mentor and provide technical guidance to junior engineers while promoting engineering best practices and knowledge sharing within the team.
  • Ensure compliance with applicable engineering codes, local regulations, environmental requirements, health and safety standards, and company quality management systems.


Skills

Apply

See also

Engineering Design jobs by country — openings, pay and top skills →