Offshore HSE Supervisor
Posted Updated
The development consists in production by subsea wells to a spread moored FPSO (75 kbopd, 60 kbop water injection, 400 MMscfd gas reinjection, oil tandem offloading) with a contextualized Technical Referential.
• To be responsible for the supervision of HSE during construction activities carried out onboard Installation vessel for SURF Packages. The installation SoW is: FPSO piles, PISA & heavy structures, Rigid flowlines & risers, Umbilical, Well jumpers and spools.
- Adopt and to demonstrate an exemplary behavior regarding Company Ethics and “Code of Conduct” policy and HSE rules and regulations.
- Promote the implementation of the Project HSE Charter and the No Blame policy.
- Ensure the yard respects the HSE standards defined in the contract, the project HSE plan and its supporting HSE plans & procedures.
- Contribute to enhance the HSE leadership of the yard management & HSE culture of the workforce.
- Work in close liaison with the Company Construction Team and the Contractor HSE Coordinator.
- Ensure sufficient and effective HSE supervision by the yard and contribute to their coaching.
- Participate in regular HSE meetings, communication, awareness and campaigns.
- Ensure the key HSE programs (aimed at achieving a zero-injury project) are always enforced. Identify any required improvement.
- Perform regular joint HSE tours and Live Saving Checks (at least weekly) jointly with the yard management and HSE coordinator.
- BOSIET and HUET training up to date
- A degree in Engineering, Environmental Science, or a related field.
- Professional certification in Health, Safety, and Environment (e.g. NEBOSH certificate/Diploma).
- Extensive experience in HSE supervision, preferably in construction yard construction for Oil and Gas Project.
- Previous experience in Angola yard
- Familiarity with local and international HSE regulations.
- Language: English mandatories, French and Portuguese are a plus
- 5 years minimum of similar experience
- The position is onboard CTR Installation vessel – Angola
- Working rhythm: rotation 4 weeks x 4 weeks
- Then perform rotations in Angola during the operation phase, 7 days a week.
- Starting date: Q1 2027
- Duration: 1 year, renewable