Piping Fabricators
Posted Updated
Description
• Fabricators should be able to do fitup of straight & rolling pipes atleast 80 inch dia in 8 hours.
Sign in to read and join the discussion.
• Fabricators should be able to do fitup of straight & rolling pipes atleast 80 inch dia in 8 hours.
Sign in to read and join the discussion.