Planning Engineer
Posted Updated
- Prepare a complete Baseline Schedule from scratch based on BOQ, drawings, scope of work, and contract.
- Build a professional WBS and link BOQ items to schedule activities.
- Determine durations based on quantities and productivity rates, not just estimates.
- Set up correct Logic & Relationships: FS / SS / FF / Lag, and analyze Critical Path & Total Float.
- Prepare Resource & Cost Loaded Schedule as needed.
- Prepare Manpower & Equipment Histograms and S-Curves.
- Update the schedule weekly and monthly, inputting Actual Start/Finish, Remaining Duration, % Complete accurately.
- Prepare 2/3/4 Weeks Lookahead and compare Planned vs Actual.
- Analyze delays and identify critical and delayed activities, preparing Recovery / Catch-up Schedule.
- Ability to prepare Delay Analysis and EOT/Claims support is a strong advantage.
- Prepare management reports including SPI, Progress Variance, Critical Activities, Milestones, Forecast Completion.
Skills
- Bachelor's degree in Civil or Architectural Engineering.
- Experience in the same title of no less than 4 years.
- Primavera P6: Advanced level, not just activity input.
- Advanced Excel proficiency, Power BI preferred.
- Preference for Saudi nationals.