Senior Project Scheduler
Description
Job Summary
The Senior Project Scheduler is responsible for leading the planning, developing, baseline management, progress tracking, and critical path method (CPM) schedule analysis for major capital EPC and construction projects within the Yates Industrial Division. Serving client facilities across the Pulp & Paper, Industrial Power Generation, Chemical Process, and Specialty Metals sectors, this position provides critical schedule governance across projects governed by an 80% Direct-Hire craft labor and 20% Subcontractor execution model.
The Senior Project Scheduler acts as the subject matter expert in Oracle Primavera P6, working closely with Project Directors, Project Managers, and General Superintendents to build fully resource- and cost-loaded master schedules, track craft labor productivity, model plant shutdown/turnaround tie-in sequences, perform Time Impact Analyses (TIA) for change management, and ensure project schedule reliability from preconstruction through mechanical completion, commissioning, and facility handover.
Operating Environment & Execution Model
The Yates Industrial Division operates primarily under a self-perform, direct-hire delivery model:
- 80% Direct-Hire Craft Labor: Heavy industrial civil/foundations, structural steel erection, heavy mechanical equipment setting, pressure vessels, high-pressure piping fabrication/installation, boiler erection, and electrical & instrumentation (E&I). The master schedule must feature rigorous, granular resource-loading (craft man-hours, crew sizing, equipment curves, and density analysis).
- 20% Subcontracted Specialized Trades: Specialty scaffolding, industrial coatings/linings, thermal insulation, refractory, non-destructive testing (NDT), specialized electrical testing, and chemical cleaning. Schedules must establish seamless interface milestones and handoff criteria to avoid trade stacking and work delays.
Primary Duties & Responsibilities
1. Baseline Schedule Development & Architecture
- Develop, structure, and maintain comprehensive, logic-driven Level 3 and Level 4 CPM Master Schedules in Primavera P6 in full compliance with contract specifications, project milestones, and Yates project execution standards.
- Establish standard Work Breakdown Structures (WBS), Organizational Breakdown Structures (OBS), activity coding dictionaries, and calendar configurations tailored to heavy industrial facility operations.
- Lead collaborative planning sessions and interactive pull-planning workshops with project management, discipline superintendents, estimators, and client representatives during preconstruction.
- Perform schedule diagnostic checks utilizing industry standards (e.g., DCMA 14-Point Assessment, Deltek Acumen Fuse) to verify logic integrity, eliminate open ends, monitor constraints, and establish realistic float paths.
2. Direct-Hire (80%) Resource Loading & Productivity Integration
- Fully resource-load CPM schedules with direct-hire craft disciplines (pipefitters, welders, boilermakers, ironworkers, millwrights, electricians, operators, and laborers).
- Generate and analyze weekly craft manpower loading histograms, cumulative man-hour S-curves, and crew allocation models to ensure project staffing feasibility and identify craft mobilization ramps.
- Coordinate with field supervision to integrate Unit Tracking, daily production rates, and earned man-hours directly into P6, comparing budgeted versus actual productivity across key commodities (linear feet of pipe, tons of steel, cubic yards of concrete, linear feet of cable/tray).
- Incorporate major construction equipment resources (heavy lift cranes, rigging packages, specialized transport) into the schedule to prevent equipment idle time and jobsite spatial conflicts.
3. Subcontractor (20%) Integration & Interface Management
- Review, validate, and integrate specialty subcontractor detailed schedules into the integrated master schedule (IMS), ensuring scope alignment and contractually enforceable milestone dates.
- Establish critical predecessor/successor logic handoffs between Yates direct-hire crews and subcontractors (e.g., structural steel handoff to equipment erectors, piping hydrotest handoff to insulation and heat trace contractors).
- Monitor subcontractor progress, identify schedule variances early, evaluate recovery schedules submitted by vendors, and ensure trade partners adhere to Yates Site-Specific Safety and QA/QC requirements.
4. Outage, Turnaround & Shutdown Scheduling
- Develop granular, hour-by-hour and shift-by-shift schedules for high-risk plant outages, shutdowns, and major process tie-ins within operating industrial mills and power plants.
- Establish dedicated turnaround WBS frameworks with clear isolation, hot-work, demolition, tie-in, testing, and system startup sequences.
- Facilitate daily turnaround progress review meetings, update critical paths multiple times per shift during hot-outage execution, and coordinate dynamic workaround strategies with plant operations teams.
5. Progress Updating, EVMS & Variance Analysis
- Lead the weekly and monthly project schedule update cycles, collecting verifiable physical percent complete data from field supervision, inspection records, and quantity installation logs.
- Apply Earned Value Management (EVM) principles to calculate and evaluate Schedule Performance Index (SPI), Cost Performance Index (CPI), schedule variance (SV), and estimated time to complete (ETC).
- Identify critical path trends, near-critical path shifts, logic drifts, and negative float developments; collaborate with project leadership to design actionable schedule mitigation and recovery plans.
6. Change Management, Time Impact Analysis (TIA) & Claims Defense
- Partner with Project Directors and Commercial Managers to model potential scope changes, owner-directed delays, differing site conditions, and weather impacts using Fragnet insertion and Time Impact Analysis (TIA).
- Maintain rigorous contemporary schedule records and baseline variance logs to substantiate equitable contract time extension requests and defend against delay or liquidated damage claims.
- Assist with the monthly preparation of the End Of Job (EOJ) reporting, forecasting completion dates, burn rates, and financial revenue recognition curves.
7. Safety, Culture & Yates Standards
- Integrate mandatory safety milestones (pre-start safety walk-downs, critical lift plan approvals, OSHA compliance audits, commissioning hazard reviews) into project logic.
- Champion Yates Core Values, Ethical Principles, and safety expectations in all professional interactions.
Preferred Qualifications
- Education: Bachelor of Science degree in Construction Management, Civil/Mechanical/Electrical Engineering, Building Construction, or a closely related technical field. Significant heavy industrial construction planning experience may substitute for degree requirements.
- Experience: Minimum of seven to ten (7–10+) years of direct planning, CPM scheduling, and project controls experience on large-scale heavy industrial construction projects ($50M–$150M+ scope).
- Industrial Sector Background: Documented experience supporting capital projects, major plant expansions, or turnaround outages in at least two of the following sectors:
- Pulp & Paper (paper machines, digesters, recovery boilers, woodyards).
- Power Generation (combined-cycle CCGT, simple-cycle, industrial cogeneration/CHP, boilers, ACCs, balance of plant).
- Chemical Process (petrochemical, chemical processing, acid plants, specialty polymers).
- Specialty Metals (mini-mills, melt shops, rolling mills, finishing lines).
- Direct-Hire Knowledge: Proven expertise building and managing direct-hire, multi-trade resource-loaded schedules (manpower, equipment, and commodity curves).
Software & Technical Requirements
- Primavera P6: Advanced to expert-level mastery of Oracle Primavera P6 extensive experience configuring cost/resource dictionaries, user fields, global change routines, and layouts.
- Schedule Diagnostics & Risk: Hands-on proficiency with Deltek Acumen Fuse, Acumen Risk, or comparable schedule analytics and DCMA 14-point audit tools.
- Office & Database Tools: Advanced Microsoft Excel proficiency (pivot tables, complex formulas, Power BI integration, macro utilization); proficiency in MS Word, PowerPoint, and MS Project.
- Field Management Software: Working knowledge of project management platforms such as ProjectSight, ViewPoint, Procore, or Bluebeam Revu for schedule publishing and document integration.
- Engineering & Drawing Comprehension: Strong ability to read, interpret, and cross-reference industrial engineering drawings, P&IDs, isometric piping diagrams, single-line diagrams, structural framing plans, and equipment vendor general arrangements.
Professional Certifications (Preferred)
- AACE International: Planning & Scheduling Professional (PSP) or Certified Cost Professional (CCP).
- Project Management Institute: PMI Scheduling Professional (PMI-SP) or Project Management Professional (PMP).
Key Competencies
- Analytical Thinking & Problem Solving: Exceptional capacity to break down complex industrial scopes into logical task sequences; adept at identifying latent scheduling risks and modeling corrective interventions.
- Detail-Oriented Precision: Uncompromising rigor regarding schedule logic integrity, relationship validity, calendar definitions, and data accuracy across large networks (3,000+ activities).
- Cross-Functional Collaboration: Ability to communicate complex scheduling data, critical path constraints, and recovery options constructively to craft superintendents, executive leadership, and client directors.
- Time Management & Autonomy: High capacity to juggle multiple deadlines, project update cycles, and outage turnaround demands in a high-intensity industrial environment.
- Strategic Perspective: Demonstrates foresight in understanding how sequencing decisions impact labor productivity, trade congestion, cash flow, and plant commissioning milestones.
Physical Demands/Essential Job Functions:
- The job description reflects an assignment of essential functions; it does not prescribe or restrict the tasks that may be assigned. Physical requirements for this role may include but are not limited to walking, standing, operating tools/equipment, and lifting items (up to 25 lbs.). Tasks may also be carried out in varying weather conditions and environments as applicable to the position.
About Yates Construction
Ranked among the top commercial and industrial construction companies in the country by Engineering News-Record, Yates Construction is family-owned and provides a wide range of construction and building services. Incorporated in 1964 by William G. Yates Jr., we have steadily grown to become one of the top commercial and industrial construction companies in the nation. We are financially sound with a significant bonding capacity as well as vast personnel and equipment resources.
Our portfolio includes commercial and industrial projects from various sectors including arts and culture, civil, commercial, education, entertainment and gaming, federal, healthcare, hospitality, municipal, retail, and technology. We work hard to understand our client’s business needs and continually look for opportunities to provide additional value to our clients and their projects.
Our client relationships are the foundation of our success, and our primary goal is to help each of our clients achieve their vision. We do this by carefully managing the details and complexities of each project and communicating constantly with all team members.
Yates Construction provides equal employment opportunities (EEO) to all employees and applicants for employment without regard to race, color, religion, sex, national origin, age, disability, or genetics. In addition to federal and state law requirements.
Yates complies with applicable state and local laws governing nondiscrimination in employment in every location in which the company has facilities.
Skills
Sign in to read and join the discussion.