Skip to content
Search jobs inside your AI agent. Claude, ChatGPT, Claude Code, Codex, Gemini, Cursor and Grok
Connect

ELITE Solar

NewBe an early applicant

Project Manager

Posted Updated

Summary

Owner-side Project Manager in Bucharest delivering a 250 MW / 500 MWh standalone BESS in Romania — managing EPC construction and installation, a 400 kV booster substation, and four compliance tracks (ATR, grid capacity auction, ANRE authorisation, grid connection) through to COD. Requires power/storage project management experience and fluent Romanian.

Position Overview

Act as the owner’s first-line accountable manager for the Romania project, representing the owner in the full-cycle management of the EPC Contractor, Transelectrica/DSO, ANRE and local permitting authorities. The core mission is not merely to “complete construction,” but to ensure that this 250 MW / 500 MWh standalone BESS is legally established and commercially operational as a regulated power asset through four compliance tracks: ATR, grid capacity auction, ANRE authorisation, and grid-connection compliance.

Key Responsibilities

  1. BESS construction and installation delivery management
  • Take owner-side responsibility for overseeing the EPC’s BESS construction and installation execution for the 250 MW / 500 MWh storage system, covering battery containers/battery clusters, PCS, MV transformers, auxiliary power, DC and MV cabling, grounding, HVAC, fire detection and suppression systems, BMS/EMS/SCADA interfaces, and associated civil works and platforms.
  • Review and approve, on the owner’s side, the EPC’s BESS construction organisation design, installation method statements, lifting and transport plans, battery container storage and preservation requirements, installation sequence, and the interface coordination plan among civil, electrical, fire-fighting, HVAC and control disciplines.
  • Supervise the complete installation chain from equipment delivery and receiving/unpacking inspection through battery container lifting and positioning, DC-side cabling and termination, PCS and MV equipment installation, auxiliary system installation, to mechanical completion; confirm that pre-installation storage conditions (temperature, humidity, SOC, fire separation and security) meet manufacturer and contract requirements.
  • Establish owner-side installation milestones and quality gates jointly with the Site QA&QC Engineer; ensure that installation completion and pre-commissioning readiness are confirmed before energisation and commissioning activities begin. The Project Manager is accountable for delivery schedule, resource loading and interface closure, while QA&QC retains independent verification authority.
  • Manage the capability and mobilisation of EPC installation subcontractors, site logistics and laydown areas, and installation-related change requests; coordinate BESS installation interfaces with the 400 kV booster substation, grid-connection works and the overall project schedule. Where installation non-conformities or unsafe conditions affect delivery or grid-connection readiness, exercise owner-side authority to require suspension and corrective action.
  1. EPC contract and 400 kV booster substation delivery control
  • Lead technical and commercial interface management of the EPC contract. The project includes a 400 kV booster substation, i.e. transmission-level infrastructure; the EPC’s technical capability and delivery record must be verified at early contract execution, not deferred to commissioning.
  • Review the EPC’s 400 kV substation design and technical specifications of major equipment (main transformer, GIS, protection systems) for compliance with Transelectrica’s technical norms (ITN), ensuring the substation meets transmission-asset connection requirements from design stage.
  • Review and negotiate EPC variation requests on the owner’s side, with particular focus on preventing unreasonable claims framed as “grid-connection cooperation.”
  • Supervise fulfilment of owner-side obligations under the connection agreement (contract de racordare) and coordinate Transelectrica’s grid-connection acceptance and energisation process for the 400 kV booster substation.
  1. Owner-side supervision of grid compliance (ANRE Order 3/2023) and commissioning
  • Ensure the EPC’s grid-connection test programme covers all technical requirements of ANRE Order 3/2023 for storage facilities connected to the public grid, as well as the compliance verification procedures under Order 51/2019. Test scope must include active/reactive power response, frequency and voltage ride-through capability, protection setting verification, SCADA/telemetry/metering interfaces, and safe-state transition logic of the BESS under grid disturbances.
  • The 400 kV steady-state operating range must meet Transelectrica requirements (voltage 380–420 kV; frequency 49.50–50.50 Hz as applicable). The commissioning programme must cover verification scenarios for coordinated operation of BESS and booster substation within this range.
  • Review commissioning reports and confirm contractual performance guarantees (RTE, availability, ramp rate, reactive capability) before signing the COD certificate.

Qualifications

  1. Mandatory
  • Bachelor’s degree or above in engineering (electrical engineering preferred).
  • 5+ years of full-cycle project management experience in storage or transmission-level power projects, including at least 2 years executing projects in Romania or neighbouring CEE countries. Experience with standalone BESS (not only co-located storage) from permitting to COD is preferred.
  • Familiar with the Romanian grid-connection system: ATR process, Transelectrica grid-connection acceptance, ANRE Order 3/2023. Practical experience with the post-2026 auction-based capacity allocation is preferred.
  • Owner-side control experience on 400 kV (or ≥220 kV) booster substation projects; understanding of delivery cycles, testing requirements and Transelectrica acceptance logic for transmission-level equipment.
  • Fluent Romanian (able to chair Romanian-language meetings with Transelectrica, ANRE and EPC and review Romanian compliance documents); English as working language.
  1. Key Competencies
  • Able to manage the project within a “regulated power asset” framework, rather than viewing tasks solely from an EPC delivery perspective.
  • Strong sense of rhythm in parallel progression of ATR/auction/ANRE licensing; able to identify the true critical path among multiple compliance tracks.
  1. Preferred
  • Experience with Romanian BESS grid connection projects.
  • Experience with owner-side project management in Romania/EU.
  • PMP/IPMA or Romanian registered engineer qualification.


Skills

Apply

See also

Project Management jobs by country — openings, pay and top skills →