A detailed organisation chart (organogram) of Tenderer’s proposed organisation structure for the CONTRACT including:

(i) site crew(s) and direct line managers,

(ii) names and job titles of the relevant support contractor personnel, including operational manager(s), technical leads relevant to the scope, account management, sales, account receivables

T5-Method Statement

Method statement demonstrating TENDERER’s understanding of the SCOPE as a minimum detailing:

(i) List of resources, equipment, tools and consumables required to carry out work, and how these will be obtained, procured or sourced by TENDERER,

(ii) Lead times and mobilization procedure,

(iii) Items and site setup required as provision from COMPANY unless such provision is already assigned to a party under SCOPE,

(iv) SCOPE execution procedure(s),

(v) On-site logistics including equipment and material control,

(vi) Reporting plan & reports,

(vii) Critical interfaces and management of these,

(viii) Description of off-site/emergency support,

(ix) Any other information TENDERER deems important to include.

T6- Worksite Establishment

Drawings/layouts of the proposed industrial facilities detailing proposed locations and dimensions required to support the provision of the SCOPE including but not limited to:

(i) Office

(ii) Equipment (yard)

(iii) Materials yard

(iv) Material control

(v) Accommodation

(vi) Workshop

(vii) List of Own Plant Tools and Equipment Specific to current scope;

(viii) List of Contractor Standard Tool Kit for non-metallic/rubber lining Technician.

(ix) Own transport support (pick up) to and from site and inside within QSGTL

T8- Subcontracting

A list of Subcontractors Tenderer intends to employ for the execution of the Scope detailing per Subcontractor as a minimum:

(i) The full name, address, phone number of each Subcontractor.

(ii) The areas of the Scope to be subcontracted.

(iii) The capabilities and experience of each Subcontractor.

(iv) Details of previous projects where Tenderer used each Subcontractor (if any).

T9- Mobilisation Plan

Detailed mobilisation plan leading up to full readiness to start performing the SCOPE. This plan shall be in bar chart form and shall identify all key activities, milestones and the activities on the critical path (activities which, if delayed, will impact the commencement and/or completion dates). Tenderer shall assume an Effective Date of 15/02/2027 for this plan.

This bar chart shall clearly identify a number of steps for each of the following items:

(v) Procurement

(vi) Establishment & mobilisation of subcontracts

(vii) Recruitment and training of Contractor Personnel

(viii) Construction, modification and establishment of Facilities

(ix) Import and clearance of Equipment and Materials

(x) Commissioning

(xi) Interim and start-up audits

(xii) Any other item Tenderer deems relevant.

T14-Other Technical Information

Any other technical or operational information the Tenderer deems critical to relay to COMPANY, including any potential continuous improvement initiatives

Design Verification

Tenderer shall submit a copy of the following client approved documentation for composite wrapping, by Contractor:

a) Design calculations for composite wrapping

b) Work flow for approval of design and drawings

c) Non metallic piping material details, specify wrapping materials and resin to be used , with MTC

d) design condition/ design life time as per ISO 24817

e) resin chemical compatibility with process fluid

f) surface preparation acceptance criteria /method/NDT inspection

Item in Technical Questionnaire

Additional Technical Submission Requirement (composite wrapping )

a) Copy of Material Procurement procedures for consumables;

b) Copy of wrapping design and application procedure for composite wrapping ;

c) List of mandatory training provided for contractor personnel and certification process for the scope;

Item in Technical Questionnaire