Project Manager MEP
Work location Bangalore Airport
Experience 7 to 8 years
Scope Of Work
1. Pre-Construction & Design Coordination
• Clash Detection & BIM/Autocad Review: Lead BIM/Revit coordination
meetings to resolve spatial clashes between HVAC ducts, cable trays, fire
lines, plumbing pipes, and structural elements (beams, slabs, shafts).
• Drawing Validation: Review and approve Good for Construction (GFC)
drawings, shop drawings, schematics, and builder's work drawings (core-cut
and sleeve locations) before work starts.
2. Procurement, Contracts & Commercial Management
• Technical Bid Evaluation (TBE): Evaluate subcontractor quotes and
equipment proposals against project design criteria and approved vendor lists.
• Material Submittals & Approvals: Scrutinize Material Inspection Requests
(MIRs) and technical data sheets for major plant equipment (chillers,
transformers, DG sets, pumps, panels, AHUs, fire alarm systems).
• Billing & Variations: Verify contractor measurement sheets, certify running
account (RA) bills, and assess subcontractor variation claims against the
original Bill of Quantities (BOQ).
3. Site Execution & Interface Management
• Civil-Structure Alignment: Ensure wall openings, slab sleeves, cast-in
conduits, and foundation plinths for heavy machinery (e.g., chillers, cooling
towers, transformers) are executed on schedule before structural concrete
pours.
• Daily Progress Monitoring: Track execution milestones using Gantt
charts/Primavera/MS Project against the master project schedule.
• Inter-Disciplinary Alignment: Resolve boundary issues between specialized
trades (e.g., BMS controls vs. HVAC dampers; fire pump room piping vs.
electrical starter panels).
• Weekly/Daily Meeting: Need to attend site co-ordination meeting with client
and other vendors.
4. Quality Control, Safety & Statutory Compliance
• QA/QC Enforcement: Implement the MEP Quality Inspection Plan (ITP),
verify pressure testing (hydro-testing of chilled water, firefighting, and
domestic lines), insulation integrity, and cable megger testing.
• HSE Compliance: Enforce site safety standards for hot works
(welding/brazing), working at heights, confined space entries (shafts, tanks),
and lock-out/tag-out (LOTO) procedures.
• Liaison & Authority Clearances: Secure statutory approvals and
inspections, including:
o Electrical Inspectorate (CEIG / State Electrical Board) for
substations, HT panels, and DG sets.
o Fire & Emergency Services for fire pump operations, hydrants,
sprinklers, and life safety NOCs.
.
5. Testing, Adjusting, Balancing & Handover (TAB & T&C)
• Pre-Commissioning Checks: Verify dry-run procedures, electrical phasing,
rotational checks on motors/pumps, and duct air-leakage tests.
• Integrated Testing: Conduct integrated building system tests (e.g., initiating
a fire alarm trip to confirm that AHUs trip, stairwell pressurization fans
activate, access control doors unlock, and elevators recall to ground level).
• Handover Documentation: Compile As-Built drawings, Operation &
Maintenance (O&M) manuals, warranty/guarantee certificates, spare parts
lists, and train the client's facility management (FM) team.
Essential Technical Knowledge Matrix
Service
Domain Key Systems Managed
Mechanical
(HVAC)
Chillers, VRF/VRV units, AHUs, FCUs, ventilation fans, duct
networks, chilled water piping, balancing valves.
Electrical (HT
/ LT)
Transformers, HT/LT panels, busducts, DG sets, UPS, cable
trays, earthing grids, lightning protection, internal/external
lighting.
Plumbing &
PHE
Water supply networks, hydro-pneumatic pumping systems,
drainage, rainwater harvesting, Water Treatment Plants
(WTP), and STPs.
6. Must be knowing MSP – Microsoft Project for preparation of Schedule.