Quality Control Section Head
Posted Updated
Description
- Develop and implement QC Plans, inspection and test governance, hold points, witness points, surveillance activities, and release criteria based on project risks and contractual requirements.
- Maintain project quality-risk registers, focusing QC resources on critical systems, high-risk activities, repeated defects, and acceptance-critical interfaces. Escalate unresolved risks through the defined governance structure.
- Review and verify drawings, single-line diagrams, wiring schematics, cable schedules, termination diagrams, cabinet layouts, earthing and lightning protection designs, interface matrices, specifications, method statements, test procedures, and vendor/subcontractor quality documentation.
- Identify and resolve technical inconsistencies, interface gaps, constructability risks, unclear acceptance criteria, and document-control issues with Engineering, Project Management, Procurement, Commissioning, and other stakeholders.
- Lead and coordinate incoming material inspections and field inspections covering equipment installation, cable routing and trays, terminations, labeling, grounding, bonding, panel/cabinet installation, wiring, and electrical/control/telecom interfaces.
- Coordinate QC inspection coverage across multiple sites and ensure timely response to inspection requests and project milestones.
- Review and approve QC aspects of FAT, SAT, site tests, loop and point-to-point checks, functional tests, commissioning, and system-level testing, ensuring calibrated and traceable test equipment is used.
- Control test exceptions, failed tests, retesting, punch lists, commissioning evidence, acceptance requirements, and the completeness of final quality and handover dossiers.
Skills
- Strong ownership, accountability and follow-through; does not allow critical quality actions to remain ambiguous or unassigned.
- Structured problem solver who distinguishes immediate containment from root-cause correction and systemic prevention.
- Calm under pressure, particularly during testing, commissioning, client witness activities and acceptance periods.
Skills
Sign in to read and join the discussion.