The Senior Production Planner owns an integrated, feasible production plan aligning demand with equipment, tooling, labor, and material. The role builds forward-looking scheduling, capacity planning, and Sales and Operations Planning (S&OP) disciplines to improve delivery and margin. Scope includes roll forming and rolling, progressive die stamping, data center fabrication cells, and outside processing.
Essential Duties and Responsibilities
Scheduling and Capacity Planning
- Build and release finite schedules over 0–4 weeks, respecting tooling, changeovers, crew coverage including 24/7 lines, material availability, and outside processing lead times.
- Balance delivery commitments, changeover cost, and line efficiency; define the release window for supervisors’ daily sequencing. Maintain work-center rules, run standards, changeover times, and crew requirements.
- Maintain 1–6 month rough-cut capacity plans for constraint equipment and labor; identify overloads and underloads and support shift, overtime, outsourcing, and equipment timing decisions.
- Model demand shifts, customer push-outs, downtime, late material, and program ramps; recommend scenarios with quantified service, cost, and inventory trade-offs.
Material Planning and S&OP
- Own time-phased coil, strip, and purchased-component requirements by grade, gauge, and width. Purchasing places and expedites orders; flag risks where commitments precede firm customer demand.
- Run the monthly S&OP cycle: collect Sales demand, prepare supply and capacity views, frame decisions, facilitate meetings, and close actions. Maintain the agreed master production schedule.
Order Changes and Plan Execution
- Propose and administer time fences and order-change rules. Assess pull-ins and push-outs against capacity, material, and other customers; quantify raw material, WIP, and finished-goods exposure for commercial discussions.
- Publish plans to Production, Maintenance, Quality, Purchasing, and Sales. Provide daily huddle input, lead weekly schedule reviews, investigate misses, and drive corrective actions.
- Escalate risks promptly with options. Maintain accurate ERP planning data, including routings, run rates, and lead times, with responsible functions; improve scheduling tools and reporting.
Decision Rights and Escalation
- Decide schedule release and load balancing within agreed capacity. Accept pull-ins or push-outs outside the frozen zone within policy when other customers are unaffected; inform Sales.
- Obtain Operations leader approval for frozen-zone changes. Refer customer priority conflicts to S&OP or Operations leadership; recommend overtime, shifts, and outsourcing.
- Define material requirements; Purchasing executes purchases. Supervisors retain daily sequencing within the agreed release window.
Escalate the same day when a committed order is at risk inside the frozen zone, constraint load exceeds [90% – confirm] of demonstrated capacity in the next four weeks, a material shortfall falls inside supplier lead time, or customer push-out exposure exceeds [$ threshold – confirm].
Performance Measures
Weekly: on-time, in-full delivery to promise date; schedule adherence; frozen-zone changes; constraint load versus demonstrated capacity; material availability at job release.
Monthly: customer push-out exposure in raw material, work in process (WIP), and finished goods; on-time S&OP completion and action closure.