Sr. Director, Nuclear Licensing & Regulatory Affairs
Who recruits here Pro
Up to three recruiters at Fermi America with their work email, so you can write to a person.
Part of Pro. How it works
Description
COMPANY SUMMARY
Fermi America is developing Project Matador, a private-grid energy and data campus in Carson County, Texas, near Amarillo. Our flagship HyperGrid campus, is designed to become one of the world's largest energy-driven AI complexes, integrating nuclear, natural gas, utility, solar, and battery power. Its nuclear centerpiece is four Westinghouse AP1000 units, with small modular reactors under consideration for later phases. With a planned 17 gigawatts of power capacity and 18 million square feet of AI infrastructure, Fermi America is positioned to play a leading role in the future of energy and artificial intelligence.
At Fermi America, we are building more than infrastructure. We are creating opportunities for talented professionals to help shape the next generation of energy and AI innovation.
Position overview
The Sr. Director, Nuclear Licensing & Regulatory Affairs owns Fermi America's regulatory strategy and NRC interface for new nuclear generation at Project Matador. The role leads the combined license (COL) application through review, hearings and issuance, and builds the licensing organization that will carry the units through construction, inspections and operation.
Key responsibilities
Licensing strategy and COL review
- Own the licensing strategy for Project Matador Nuclear Units 1–4, including the path from COL issuance through construction, ITAAC closure and the 10 CFR 52.103(g) finding.
- Lead the COL application through NRC safety and environmental review: requests for additional information (RAIs), audits, supplements, revisions and the mandatory hearing.
- Manage departures from the AP1000 DCD, exemptions and site-specific design changes, applying the Part 52 Appendix D Tier 1/Tier 2 departure and change-control processes.
- Evaluate licensing options for future phases, including additional AP1000 units and SMR deployment, and advise leadership on schedule and regulatory risk.
NRC and stakeholder interface
- Serve as Fermi America's primary point of contact with NRC headquarters and Region IV, including pre-submittal meetings, public meetings and Commission-level engagement.
- Coordinate with Westinghouse, Hyundai E&C, Doosan Enerbility and other partners so vendor and EPC deliverables meet licensing commitments.
- Support engagement with DOE, state agencies (TCEQ and others), local stakeholders and industry groups such as NEI and INPO.
- Represent the company in the NRC's accelerated review pilots and help shape new regulatory approaches with staff.
Submittals and compliance
- Direct preparation and quality of FSAR, ER, technical specifications, emergency plan, security plan, QA program and other licensing documents.
- Establish and maintain the licensing commitment tracking system and the licensing basis document set.
- Oversee correspondence control, docket integrity and 10 CFR 50.9 completeness and accuracy.
- Prepare for construction-phase oversight: ITAAC programs, inspection readiness, 10 CFR Part 21 and corrective action interfaces.
Leadership
- Build and lead the licensing team, including hiring, budget and use of outside counsel and consultants.
- Brief executives and the board on licensing status, risks and milestones.
- Foster a strong nuclear safety culture and a questioning attitude across the licensing organization.
Skills
Sign in to read and join the discussion.