Skip to content
Search jobs inside your AI agent. Claude, ChatGPT, Claude Code, Codex, Gemini, Cursor and Grok
Connect

SENER

Technical Architect for Data Center Construction Management

Posted Updated

Description

About the role

Would you like to participate directly in the construction of some of the most demanding technological projects?

At Quark - Grupo Sener, we are looking to hire a Technical Architect, Building Surveyor, or Building Engineer who wants to continue developing their career in Site Management (Dirección de Ejecución de Obra), participating in Data Center projects in the Community of Madrid.

If you have around 2 years of site experience and are looking to take a step towards projects of greater technical complexity, this could be a great opportunity to specialize in a growing sector and work alongside expert professionals in critical facilities and buildings.

Location

📍 San Fernando de Henares or Alcalá de Henares, Madrid | 100% on-site at construction site

Who are we?

Quark - Grupo Sener specializes in the design, project management, and construction management of data centers.

We have over a decade of experience developing projects for leading companies in the sector across Europe, Africa, and Latin America, combining architecture, engineering, and innovation to tackle technically demanding projects.

And we want to continue growing by incorporating talent that wants to grow with us.

What will your challenge be?

You will be part of the team in charge of Site Management (Dirección de Ejecución de Obra), working directly on-site and closely following the evolution of the project.

In your day-to-day

  • You will supervise the execution of works on-site, ensuring their correct execution and compliance with the project.

  • You will perform the monitoring and control of materials and equipment used during construction.

  • You will participate in controlling compliance with applicable regulations, quality, and safety.

  • You will monitor construction progress, preparing reports and identifying possible deviations.

  • You will work together with the architecture, engineering, and construction teams to resolve incidents and technical challenges.

  • You will collaborate closely with the Health and Safety team.

  • You will participate in the functions associated with Site Management in accordance with the Building Management Act (Ley de Ordenación de la Edificación).

This is a position especially oriented toward someone who enjoys being close to the construction site, wants to assume increasing responsibility, and seeks to specialize in technically complex projects.

What are we looking for?

We would like to meet you if:

  • You are a Technical Architect, Building Surveyor, or Building Engineer.

  • You have approximately 2 years of experience in construction execution, supervision, or management.

  • You have experience or interest in industrial building, complex installations, or critical buildings projects.

  • You can conduct yourself professionally in English.

  • You are accustomed to working with design, measurement, and construction management tools.

Additionally, we will value:

You do not need to master all these tools. It will be a plus if you have worked with any of them:

  • Autodesk Construction Cloud (ACC), Procore or similar construction management platforms.

  • Presto and Cost-It.

  • AutoCAD and Revit.

  • Regulations related to the Building Management Act (LOE).

Important regarding the position

This is a position directly linked to project execution, therefore it requires 100% on-site presence in the Community of Madrid.

If you like experiencing the project on the ground and seeing how the design becomes a reality, we want to meet you.

What will you find at Sener?

In addition to being part of innovative projects of high technological complexity:

  • You will work with multidisciplinary and highly specialized teams.

  • You will be able to continue developing through technical training, languages, and professional skills.

  • You will have our flexible compensation plan, which includes options such as meal cards, private medical insurance, or nursery vouchers, in addition to life and accident insurance.

  • You will have access to our physical and emotional wellbeing program, with different initiatives, sports, and workshops.

  • You will be part of a company that promotes equal opportunities, diversity, and inclusion, certified as a Family-Responsible Entity (efr).

Are you ready to take the next step?

If you want to continue growing on-site and specialize in Data Centers and critical buildings, we would love to meet you.

Join Quark - Grupo Sener and participate in projects where architecture, engineering, and construction meet.

Skills

Apply

See also

Architecture jobs by country — openings, pay and top skills →