TECHNICAL MANAGER
- Job Responsibilities:
- Preparation of QA/QC documents and ITPs and implementation in the projects.
- Review technical requirements, inspection plans, and project documentation
- to support efficient execution and proper quality assurance.
- Liaise with clients, contractors, surveyors, and internal teams regarding
- technical matters, work progress, and project coordination.
- Oversee and manage daily operational, technical, and project-related activities
- for shipbuilding, ship repair, and offshore structure conversion works.
- Supervise site teams, allocate manpower, monitor work progress, and ensure
- completion of projects within required specifications and timelines.
- QA/QC Management and Audit management
- Performing inspections as per the ITP and Project procedures and specifications.
- Follow up with Audit finding closeouts andNCRs follow up and close outs.
- Involving Welding inspection, WQT and WPSqualifications
- Controlling Painting and coating inspectionsfor piping, Structure and equipment with help of painting inspectors.
- Vendor package management in terms of materialinspection, Fabrication, welding, NDT and painting activities
- Involving FAT and final inspection for thepackages and issue release notes.
- Witnessing Hydro test for piping systems andvessels
- Involving load testing for all kinds oflifting appliances.
- Liaising with Third party Inspection agenciesand classification societies for QA/QC related matters
- Preparation of final documentation
- Additional knowledge in NDT
- Involving Validation for different types of joints and materials. Making Scan plan and interpretation for various types of UT Inspection.
- UT Inspection on Weld scanning (Carbon Steel, Duplex Etc.) Corrosion mapping, Surface, HIC Crack Detection Etc.
- Ultrasonic inspection with Normal, TR, Anglebeam, TR Angle probes in welding (Carbon Steel, Duplex, Super Duplex Etc,).
- Familiar in TCG &DAC method with SDH,NOTCH, FBH.
- Experience i n defect identification &classifying the type of Defects& Acceptance as per standard.
- Report preparation and to manage all about technical problem’s
- Review the Inspection and Test Plan, NDT Procedures as per the codes& Client requirements.
- Implementation and involving Internal, External Audit.
- Conducting safety and internal training, Examination.
- Familiar with International codes& standards such as AWSD1.1
- ASME Sec V, VIII, B31.3, DNV-OS -C401, API.
- Briefing the codes& Standards to the NDT Inspectors.
- NDT Inspection in FPSO, FSO and Various types of ships, Pressure vessel, Turret, End plates, Radial Gate, in take Gate.
- Thickness Measurement in pipelines and boilers, Furnaces, storage Tanks, vessels.
- MPI&DPT test in all kind of weld and IN fabrication works.
- Familiar in Hardness, PMI, Ferrite Inspection.
- Maintaining daily reports and co-ordination with clients.
- Carry out NDT inspection on Equipment Foundations, Bolt Tie Down and Torque check, etc.
- All rotating equipment installation/alignments, mechanical completion, clear punch list.
- Inspection on Installation of Main Engines, Generators, Mechanical ventilation Systems, Steering Gear Systems, Air Conditioning Systems and Winches, Derrick & etc.
- Raw material inspection - Review of Test certificates with respect to Standards & P.O
- Witnessing Mechanical test in laboratories -Tensile, Impact, Hardness & Bend test.
- Witnessing the pressure test, flushing and chemical cleaning piping system.
- Carrying out inspection on GRP material during and after installation as per code.
- Preparation and submitted dossiers for handover to operations.
- Keeping track of all generated Quality documents for the project and final compilation.
- Prepare and issue Inspection Reports and NCRs’
- Inspection of piping from the early stage of spool fabrication to line check, hydro test, chemical cleaning &reinstatement, till the final stage of color-coding and valve tagging.
- To conduct the factory acceptance test due to equipment delivery (FAT)
- HVAC Material Received inspection and vender certificates documents (VCD) verifications.
- Inspection of HVAC equipment site construction activities testing adjusting and balancing of system as per applicable vendor requirements and standards.
- Inspect accordance with approved drawing speciation and installation procedure and material storage procedure is properly implemented./ Inspection on ducting lining insulation of the air-conditioning system