Skip to content
Search jobs inside your AI agent. Claude, ChatGPT, Claude Code, Codex, Gemini, Cursor and Grok
Connect

CTS Group

Graduate Electrical Engineer – Data Centre Construction

Posted Updated 10 views
Promote this job

Description

CTS Group seeks a Graduate Electrical Engineer to support a major data centre project in Seinäjoki across design coordination, procurement, installation, testing, commissioning and handover. You will work with Senior Electrical Managers, Package Managers, Supervisors and BIM personnel to ensure safe, efficient progress and timely documentation.

The role offers learning from experienced engineers, exposure to HV/LV systems, and opportunities to develop BIM/CAD and technical-review skills while

Provide day-to-day engineering and administrative support to the Senior Electrical Managers, Electrical Package Managers, Electrical Supervisors, Design Manager and wider engineering team, including technical coordination, short-term planning and work-area readiness. Work with supervisors, subcontractors, vendors, BIM personnel and field engineers to support safe and efficient installation progress. Assist with RFIs, technical queries and interface issues, escalating matters that require senior engineering input. Assist in reviewing specifications, drawings and design information for scope, compliance, constructability and coordination requirements. Support the review and tracking of technical submittals, shop drawings, equipment schedules, material selections and installation proposals under the guidance of senior engineers. Support material take-offs, procurement records, delivery tracking and readiness checks for electrical equipment and materials. Maintain design-change and field-engineering records, ensuring information is updated and communicated to the relevant team members. Update progress trackers covering subcontractor activities, manpower, materials, quality, risks and constraints, and report issues to the package team. Support delivery of HV/MV and LV distribution, transformers, switchgear, generators, UPS, batteries, busbar, protection, earthing, lighting, metering, controls and associated ICT/ELV and BMS interfaces. Support QA/QC inspections, test records, non-conformance tracking and punch-list closure in accordance with approved inspection and test plans. Support FAT, SAT, electrical completion, energisation readiness, commissioning and Integrated Systems Testing. Support test documentation, system turnover, as-built records, O&M manuals, snag closure and final handover. Maintain the combined asset register, coordinating updates across project systems and supporting accurate handover information. Monitor and enforce compliance with the project asset naming convention, identifying and correcting inconsistencies. Maintain cable reference records and support consistent cable identification across drawings, schedules, installation and testing documentation. Bachelor’s degree in Electrical Engineering or a closely related discipline. Graduate-level role; ideally two years of relevant electrical engineering, construction or site-based experience. Interest in developing practical knowledge of electrical installation, testing, commissioning and project handover. Basic understanding of electrical distribution systems, switchgear, transformers, generators, UPS, batteries, earthing, protection and controls. Ability to read engineering drawings and schedules, with an interest in developing BIM/CAD and technical-document review skills. Organised and detail-focused, with the ability to maintain registers, trackers and technical records accurately. Good communication, teamwork and problem-solving skills, with fluent written and spoken English and a willingness to learn in a site-based environment.] Desirable Criteria: Academic project experience related to data centres, mission‑critical facilities, building services or construction is beneficial. Familiarity with electrical testing, commissioning, asset information, cable schedules or handover documentation. Lunch benefit

Skills

What Junior Industrial Engineering jobs ask for — and how much of it you have →
Apply

See also

Industrial Engineering jobs by country — openings, pay and top skills →