Intelligent Scheduling Engineer (IMC)
Description
Intelligent Scheduling Development Department (ISDD) in TSMC's Intelligent Manufacturing Center (IMC) is responsible for the dispatch and scheduling of various TSMC fabs. It considers multiple constraints such as processes, machines, products, and waiting times, and employs three main methods:
1. Automated rules (Rule based)
2. Optimization through mathematical planning models (Model)
3. Optimization with metaheuristic algorithms (Metaheuristic)
The system determines the sequence of products that machines will produce in the future. Colleagues continuously refine the computational engine to improve solving performance and scheduling quality. They also utilize self-developed scheduling systems to help fabs adapt to various scenarios to achieve fab goals and tasks. Moreover, they constantly enhance fab production efficiency and increase wafer output by identifying and capitalizing on opportunities for improvement.
1. Develop and maintain Scheduling / Dispatching and Manufacturing Report System.
2. Communicate with users to define requirements, design, implement, and deploy systems, and continuously improve them using software engineering methodology.
3. Design system architecture of cross department projects.
4. Lead system design review.
5. Survey and introduce new IT solutions.
Requirements
1. Master degree or above majoring in Industry Engineering, Computer Science, Computer Engineering or related fields.
2. Good communication skills.
3. Experience and Familiar with AI solutions such as optimization algorithms, machine learning, statistical methods, is preferred.
Skills
Sign in to read and join the discussion.